Photo Gallery
| Monster Monument construction - April 17, 2008 (April 17, 2008) |

The Monster Monument is nearly finished at ACI Composites in Lancaster, Pa. |

A designer works on the face of the monster. |

Soon the monster will be sprayed with fiberglass to give him his signature concrete color. |

A designer carves the monster's hand from foam. |

Overview shot of the monument area, Victory Plaza and the expanded FanZone. |

Crew continue to work on the base of the monument. |

A look at the new Victory Plaza from Leipsic Road. |

A crane moves a leg of the entrance way arch into place. |

New entrance way from Lot 1 parking. |
|