Third phase of Monster Makeover construction: Pit wall and pit road (January 8, 2009)

01.08.09 - Crews remove beams from the site of the old boiler plate pit wall.

Crews use a crane to pull the existing wall out of the ground to make way for the new concrete barrier.

A construction worker continues to work on the existing pit wall.

The remnants of the old pit wall sit piled up on pit road.

The grass in front of the pit road wall has been eliminated.

A shot of pit road from the start-finsh line.

One-by-one the posts were removed.

A worker removes piece of the beam.

A view of pit road near Victory Lane.

After the crew removed the boiler plate they turned their attention towards pulling the support posts from the ground.

A crane was used to lift portions of the wall from the ground.

Pieces of the old pit wall lay in a crumbled heap on pit road.

A single beam from the old pit wall remains standing.

A worker clears scraps from the pit wall.

01.28.09 - Rebar has been secured in the area of where the new concrete pit wall will be built.
 